Waterproofing of pile heads

2 Waterproofing of pile heads
KÖSTER NB 1 Gris
5 Waterproofing layer
KÖSTER Deuxan 2C
KÖSTER NB 4000
6 Embedded Mesh
KÖSTER Glass Fibre Mesh
8 Gliding Layer

Damage in existing buildings is often caused by leaking pile foundations. Water can enter the building through the construction joints or it makes its way along the reinforcement steel. The waterproofing of pile heads has to withstand heavy loads from the whole building and it needs be easily connected to the area waterproofing.

At first all non load bearing materials and separating substances have to be removed from the surface of the pile head. After that, the surface has to be levelled and reprofiled with KÖSTER Repair Mortar. This reprofiling must also include the installation of a fillet adjacent to the pile head. KÖSTER NB 1 Grey is used to waterproof the pile head.

The waterproofing on top of the blinding layer is made with KÖSTER Deuxan 2C. Embed KÖSTER Glass Fiber Mesh into the fresh first layer. Before pouring the concrete for the floor slab a gliding layer consisting of two layers of customary PE-Foil is applied between the waterproofing and the concrete. Protect the waterproofing layer from mechanical damage when continuing with the application.

Always adhere to the specifications in the respective Technical Guidelines.

 

Back

Top
Albania Austria Bosnia and Herzegovina Brasil Bulgaria China Croatia Czech Republic Denmark Finland Germany Ghana Greece Hungary Italy Japan Kazakhstan Kuwait Latvia Lebanon Macedonia Mexico Netherlands New Zealand Norway Panama Poland Portugal Romania Russia Senegal Serbia Slovakia Slovenia South Africa Spain Thailand Turkey Ukraine United Kingdom United States of America